Major Groundworks
Client: NHBC Duration: 12 weeks Location: South Yorkshire
The overall scope of works for the major groundwork engineering project consisted of the following:
- Stabilised and re-profiled existing earth slopes using a layered geo-grid to provide a reinforced earth retaining system.
- Repaired and diverted existing surface water and foul drainage pipes.
- Reconstructed plot driveways and paths on a geo-grid stabilised sub-base.
- Reconstructed, replaced and relocated existing boundary fencing and associated landscaping works to all affected areas.